401 Edwards St #2110 - Shreveport, LA 71101
1-888-277-5485
EL paso - liner and logo

The Permanent Fix for Aging Wastewater Infrastructure

Keep scrolling to discover the sustainable and trenchless rehabilitation method for vertical wastewater infrastructure: THE CIP LINER.

The Challenge

The Hidden Cost of Aging Infrastructure

Every day, cracked manholes and leaking lift stations allow groundwater to enter into collection systems. This inflow & infiltration (I&I) floods treatment plants with excess water, which utilities and municipalities pay to process and maintain. These EPA statistics show where the money is going, and where it can be recovered:

EPA info Added value

The Solution

Meet The CIP Liner

The cured-in-place liner is the 21st-century trenchless solution to deteriorating vertical wastewater structures. It is strategically engineered from two layers of structural fiberglass with an impermeable inner membrane tucked between them, then saturated with epoxy resin inside and out.

That inner member is the difference-maker: it guarantees the liner is impervious to H2S sewer gas.

The CIP Liner benefits

How It's Built

How the CIP Liner works

How We Work

A Proven Process, Documented End to End

For over 24 years, Infrastructure Rehabilitation has lined thousands of structures throughout the United States, and with that experience comes a proven process, thoroughly trained installers, and quality assurance. When working with Infrastructure Rehabilitation, one can expect the following processes:

1. Plan to the Objectives

  • Infrastructure Rehabilitation starts by identifying your short and long-term rehabilitation goals. Our team then builds a project plan designed to achieve those goals.

2. Measure & Evaluate

  • Before any installs begin, each structure is measured and assessed by our manufacturer-trained, certified project managers.

3. Quality Assurance & Control

  •  Upon completion, we provide a comprehensive report, before/after photos, and a curing log with GPS locations for each structure within the project.

See the Results

Before and After 2 Before and After

Structures once believed beyond repair are rehabilitated, permanently sealed, and warrantied for 20 years.

The Comparison

The CIP Liner VS Fiberglass Inserts

The CIP Liner VS Fiberglass Inserts

Vertical Structures We Rehabilitate:

Structures Infrastructure Rehab rehabilitates
West Texas Install The CIP Liner - Shreveport Lift Station 1

Scroll through our Services page or talk to a CIP expert to learn more about Infrastructure Rehabilitation and the Cured-in-Place Liner.